Not sure what the progress means when adding or refreshing a job? Check out the break down:
0 Job started
5 Validating host
10 Connecting to host
20 Generating UUID for the host
25 Preparing toolkit directory on the host
30 Pushing OS inspector toolkit to the host
35 Inspecting OS configuration on the host
37 Pushing VDB metadata to the host
75 Inspecting database configuration on the host
80 Pushing Delphix toolkit to the host
90 Persisting the current configuration of the host
100 Finished adding the host
#tod